Northamptonshire Removals The Rose of the Shires

House removals

Four kinds of house, one county

A whole-home move anywhere in Northamptonshire, quoted from what is actually in the property and how it comes out of it — not from how many bedrooms it has.

The useful thing about working across a whole county is that you see the full range of what people live in. Northamptonshire gives you four distinct kinds of house move, and the difference between them is almost entirely about the route out rather than the furniture inside.

Boot-and-shoe terraces

Northampton, Rushden, Kettering, Wellingborough

Narrow halls, a turn at the foot of the stairs, no driveway and a permit street outside. Floors run and the newel padded before anything comes down. A bay suspension where the road allows one, a shuttle where it does not.

Interwar and post-war semis

Every town in the county

The easiest of the lot. A driveway or a bay, a straight staircase and a loft that is always fuller than anyone remembers. Volume rather than access is what catches people out here.

Village stone cottages

The ironstone and limestone villages

Low doorways, thick walls, uneven thresholds and a lane that may not take a Luton at all. Surveyed in person more often than anywhere else in the county.

New build

Around Northampton, Corby and the town edges

Straightforward access on paper. In practice the estate road has cars both sides and the garage holds more than the house does. We size the vehicle from the survey rather than from the plot type.

Included as standard

Blankets in the room
Furniture wrapped where it stands, not at the tailgate. It is the single biggest difference between a careful firm and a fast one.
Dismantle and rebuild
Beds, wardrobes, flat-pack and table legs, with fixings bagged and taped to the piece they came off.
Floor and stair protection
Runners at both ends and padding on the turn. Terraced halls and stone thresholds both mark easily.
Room labelling
Boxes marked for the room they are going to, which is why the unload is the calm half of the day.
Appliance handling
Transit bolts in, fridges upright, doors off where the model allows. Gas and plumbing left to the right trades.
The walk round
Loft, garage, shed, under the stairs. Nothing is signed off until you have checked all four.

If the move leaves the county

A good share of them do. Long-distance moves are loaded differently and crewed the same at both ends. And if you are leaving the country, the European pages cover how a road move to France, Spain, Italy or Portugal works from here.

If it is smaller than a house

A flat is flat removals; a room or a part load is man and van, and costs less because it is less work.

House moves — the usual questions

How long does a house move in Northamptonshire take?

It depends on the size of the property, how much is already packed and the access at both ends. A new-build three-bed with a driveway at each end is a straightforward day; a village cottage down a lane into a terrace with permit parking is a longer one. We give you a realistic window at survey rather than a figure over the phone.

Do you pack for us?

Full pack, part pack or materials dropped off in advance, whichever suits. Most people ask us to do the kitchen, the glass and the pictures and handle the rest themselves.

Can you move us on completion day?

Yes, and most house moves work that way. It means a morning waiting on solicitors, so we load early and go the moment keys are released. If the chain slips, storage covers the gap.

Will a removal lorry get down our village lane?

Sometimes, and where it will not we shuttle from a workable point with a smaller vehicle. That is established at survey and priced in — it is not something to find out with a loaded lorry halfway down a single-track road.

What about the loft and the garage?

Tell us at survey. They hold far more than people estimate and they are the commonest reason a move runs long. Loft contents ideally come down before the crew arrives rather than during.

Tell us about the house and the lane

Two addresses, a rough room count, and anything you already know will be awkward. That is enough to get a survey booked.